Office Fit-Out Scope of Work Template

Download a free office fit-out scope of work template. Covers space planning, construction, furniture installation, IT infrastructure, and move-in coordination.

Download Free Template

Office Fit-Out Scope of Work Template
Download:

What's Included

An office fit-out takes a raw or outdated space and turns it into a functional workplace. It's more than just construction — it includes space planning, furniture, IT infrastructure, and everything needed to get your team moved in and productive. This template covers the full fit-out process from design through move-in. It works for corporate offices, startup spaces, and co-working environments where you need a clear agreement between the client, design team, and contractor. Tailor it to your space and you'll have a scope that accounts for every phase of the build-out.

Project Overview

This scope covers office fit-out work including space planning, demolition, construction of offices and common areas, IT and AV infrastructure, furniture installation, and move-in coordination.

Typical Projects Include:

  • Corporate office build-out
  • Startup or co-working space fit-out
  • Call center or operations floor build-out
  • Executive suite renovation
  • Open office conversion
  • Satellite office setup

Scope of Work

Design & Pre-Construction

TaskDescription
Space PlanningDevelop the floor plan layout — offices, conference rooms, workstations, break areas, and circulation paths.
Design DevelopmentSelect finishes, furniture, and fixtures. Develop construction documents for permitting.
IT & AV PlanningPlan data cabling, network rooms, AV systems for conference rooms, and power requirements for workstations.
Permitting & ProcurementPull building permits and place orders for long-lead items — furniture, millwork, and specialty fixtures.

Construction & Installation

TaskDescription
Demolition & PrepRemove existing partitions, ceilings, and finishes. Prep the space for new construction.
Walls, Ceilings & MEPBuild new offices and rooms. Install ceiling systems, lighting, HVAC modifications, and electrical.
FinishesInstall flooring, paint, wall coverings, glass partitions, and doors throughout the space.
IT InfrastructureInstall data cabling, network racks, wireless access points, and AV equipment in conference rooms.

Furniture & Move-In

TaskDescription
Furniture InstallationReceive, assemble, and install all workstations, desks, chairs, and common area furniture.
Signage & BrandingInstall lobby signage, wayfinding, room numbers, and any branded environmental graphics.
Final CleaningDeep clean the entire space — windows, floors, surfaces, and restrooms — before move-in.
Move-In CoordinationCoordinate the move with the client's team. Manage elevator reservations, loading dock access, and timing.

Timeline & Milestones

Office fit-out timelines depend on size and complexity. A small office might take 6-8 weeks; a full-floor corporate build-out can take 4-6 months.

PhaseDurationDescription
Design & Pre-Construction2-6 weeksSpace planning, design, permitting, and procurement of long-lead items.
Construction & Installation4-16 weeksDemo, construction, finishes, and IT infrastructure installation.
Furniture & Move-In1-3 weeksFurniture install, final cleaning, and coordinated move-in.

Roles & Responsibilities

Client / Facilities Manager

  • Provide headcount and space requirements
  • Approve design, finishes, and furniture selections
  • Coordinate IT equipment and service provider access
  • Manage the employee move logistics

Fit-Out Contractor

  • Manage construction from demo through furniture install
  • Coordinate all trades, vendors, and building management
  • Deliver the space on schedule and within budget
  • Ensure the space passes all inspections and meets code
  • Provide closeout documentation and warranty information

Materials & Equipment

Construction

  • Metal studs, drywall, and glass partitions
  • Ceiling grid, tiles, and light fixtures
  • Flooring — carpet tile, LVP, or polished concrete

IT & AV

  • CAT6 or CAT6A cabling and patch panels
  • Wireless access points
  • Conference room AV — displays, cameras, speakers

Furniture & Fixtures

  • Workstations and sit-stand desks
  • Task chairs and conference seating
  • Break room and lounge furniture

Quality Control Standards

Design Intent

The finished space matches the approved design — layouts, finishes, and furniture placement.

Functional Systems

All MEP, IT, and AV systems are tested and fully operational before turnover.

Move-In Ready

The space is clean, furnished, and ready for employees to work on day one.

Safety Protocols

Building Coordination

Follow all building construction rules — work hours, freight elevator scheduling, and noise restrictions.

Occupied Building

If the building is occupied, maintain dust barriers, control noise during business hours, and keep common areas clean.

PPE & Housekeeping

Require PPE during construction phases. Keep the work area clean and secure tools and materials daily.

Project Documentation

  • Signed contract and scope of work
  • Approved floor plans and design documents
  • Building permits
  • Furniture orders and delivery schedule
  • IT and AV specifications
  • Punch list
  • As-built drawings and closeout package

Financial Terms

Payment Structure

Office fit-outs are typically structured as lump-sum or GMP contracts with progress payments tied to milestones.

Terms & Conditions

  • Deposit due at contract signing (typically 10-20%)
  • Progress payments at major milestones — demo, rough-in, finishes, furniture
  • Furniture deposits required at time of order (typically 50%)
  • Retainage of 5-10% held until punch list completion and move-in
  • Change orders approved in writing before work begins

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1Space completed per approved design documents
  • 2All systems tested and operational
  • 3Furniture installed and configured
  • 4Space deep cleaned and move-in ready
  • 5All inspections passed
  • 6Closeout documents delivered

Frequently Asked Questions