Project Overview
This scope covers plumbing work including water supply lines, drain/waste/vent (DWV) systems, fixture installation, water heater setup, and testing. Applicable to residential and commercial projects.
Typical Projects Include:
- New construction plumbing rough-in and finish
- Bathroom or kitchen remodel plumbing
- Water heater installation or replacement
- Repipe (water supply or drain lines)
- Fixture installation (sinks, toilets, showers)
- Gas line installation
Scope of Work
Planning
| Task | Description |
|---|---|
| Site Assessment | Review existing plumbing, identify tie-in points, and note any issues that need to be addressed. |
| Layout & Design | Plan pipe routing, fixture locations, and connection points based on plans or client needs. |
| Permits | Pull required plumbing permits and schedule inspections with the local authority. |
Rough-In & Installation
| Task | Description |
|---|---|
| Water Supply Lines | Install hot and cold water supply piping to all fixture locations. Pressure test before closing walls. |
| Drain, Waste & Vent | Install DWV piping with proper slope and venting. Test for leaks before concealing. |
| Water Heater | Install or connect water heater with required shutoffs, expansion tank, and relief valve. |
| Gas Lines | Install or extend gas piping to appliances as needed. Pressure test all connections. |
Finish & Testing
| Task | Description |
|---|---|
| Fixture Installation | Install sinks, faucets, toilets, showers, and other fixtures. Connect supply and drain lines. |
| System Testing | Run all fixtures and check for leaks, proper drainage, and adequate water pressure. |
| Inspection & Handoff | Pass required inspections and walk the client through all installed work. |
Timeline & Milestones
Typical timeline for a residential plumbing project. Larger or commercial jobs may take longer.
| Phase | Duration | Description |
|---|---|---|
| Planning & Permits | 1-2 weeks | Site review, layout, permit applications. |
| Rough-In | 1-3 days | Run supply and drain lines before walls are closed. |
| Finish Work | 1-2 days | Install fixtures, connect appliances, test everything. |
| Inspection & Closeout | 1-3 days | Final inspection, punch list, client walkthrough. |
Roles & Responsibilities
Client / Property Owner
- •Provide access to work areas
- •Select and approve fixtures and finishes
- •Approve any change orders in writing
- •Process payments per the agreed schedule
Plumbing Contractor
- •Pull permits and schedule inspections
- •Supply and install all plumbing materials
- •Test all systems before closing walls
- •Complete work per code requirements
- •Clean up the work area daily
Materials & Equipment
Piping
- •Copper, PEX, or CPVC supply pipe
- •PVC or ABS drain/waste/vent pipe
- •Fittings, valves, and shutoffs
- •Pipe hangers and supports
Fixtures & Appliances
- •Sinks, faucets, and drains
- •Toilets and supply lines
- •Shower/tub valves and trim
- •Water heater
Accessories
- •Expansion tank and pressure regulator
- •Shutoff valves and hose bibs
- •Sealant, solder, and Teflon tape
Quality Control Standards
Code Compliance
All work meets local plumbing code requirements.
Pressure Testing
Water supply lines tested at required pressure before concealing.
Proper Slope
All drain lines installed with correct slope for proper drainage.
Safety Protocols
General Safety
Follow OSHA guidelines. Use PPE — especially eye protection when soldering or cutting.
Trenching Safety
Use proper shoring and trench protection when digging for underground lines.
Gas Line Safety
Pressure test all gas connections. Use approved leak detection methods before energizing.
Project Documentation
- Signed contract and scope of work
- Permit and inspection records
- Material specifications
- Pressure test results
- As-built photos
- Warranty information for fixtures and water heater
Financial Terms
Payment Structure
Payments tied to milestones — deposit at signing, progress payment after rough-in, final payment after inspection and completion.
Terms & Conditions
- •Deposit due at contract signing (typically 20-30%)
- •Progress payment due after rough-in inspection passes
- •Final payment due after finish work and final inspection
- •Change orders approved in writing before extra work begins
- •Payment due within 30 days of invoice
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All supply and drain lines installed and leak-free
- 2All fixtures operational with proper water pressure and drainage
- 3Water heater functioning correctly
- 4All inspections passed
- 5Client has received a walkthrough of completed work
- 6Work area cleaned up
Frequently Asked Questions
Ready to Use This Plumbing Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
HVAC
HVAC Scope of Work Template
View Template →Electrical
Electrical Scope of Work Template
View Template →Bathroom Remodel
Bathroom Remodel Scope of Work Template
View Template →Kitchen Remodel
Kitchen Remodel Scope of Work Template
View Template →Septic System Installation
Septic System Installation Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →