Project Overview
This scope covers a bathroom remodel including demolition, plumbing and electrical rough-in, waterproofing, tile, vanity, fixtures, and finish work.
Typical Projects Include:
- Master bathroom gut remodel
- Guest bathroom renovation
- Half bath remodel
- Shower or tub replacement
- Bathroom expansion or layout change
- ADA-compliant bathroom conversion
Scope of Work
Demo & Rough-In
| Task | Description |
|---|---|
| Bathroom Demo | Remove existing tile, vanity, toilet, shower/tub, and flooring. Protect adjacent areas from dust and debris. |
| Plumbing Rough-In | Move or add water supply and drain lines for the new layout. Includes shower valve, tub drain, and toilet flange. |
| Electrical Rough-In | Add or move circuits for lighting, exhaust fan, heated floors, and GFCI outlets. Meet current code. |
| Framing & Drywall | Build or modify walls, shower niches, and blocking for grab bars. Patch and finish drywall after inspections. |
Waterproofing & Tile
| Task | Description |
|---|---|
| Waterproofing | Apply waterproof membrane to shower walls and floor, tub surround, and any wet areas. Flood test before tile. |
| Shower Tile | Install shower wall and floor tile. Set niche tile and trim pieces. Grout and seal. |
| Floor Tile | Install bathroom floor tile with proper slope to drains. Grout and seal. |
| Shower Glass | Template and install frameless or framed shower glass door and panels. |
Fixtures & Finish
| Task | Description |
|---|---|
| Vanity & Countertop | Install vanity cabinet, countertop, and undermount or vessel sink. Level and secure. |
| Plumbing Fixtures | Install faucets, showerhead, toilet, and all trim. Test for leaks. |
| Electrical Finish | Install light fixtures, exhaust fan, mirror, and outlet covers. |
| Paint & Punch | Paint walls and ceiling. Install accessories — towel bars, toilet paper holder, hooks. Walk through with homeowner. |
Timeline & Milestones
A full bathroom remodel typically takes 4-8 weeks. Waterproofing and tile are the most time-sensitive steps.
| Phase | Duration | Description |
|---|---|---|
| Demo & Rough-In | 1-2 weeks | Demo, plumbing, electrical, framing, and drywall. |
| Waterproofing & Tile | 2-3 weeks | Waterproofing, shower tile, floor tile, and shower glass. |
| Fixtures & Finish | 1-2 weeks | Vanity, plumbing fixtures, electrical fixtures, paint, and punch list. |
Roles & Responsibilities
Homeowner
- •Select all finishes before demo (tile, vanity, fixtures, hardware)
- •Provide access and plan for using another bathroom during construction
- •Make decisions promptly to avoid schedule delays
- •Process payments per the agreed schedule
Contractor
- •Manage the project schedule and trade coordination
- •Pull permits and schedule inspections
- •Perform or coordinate all work to plan and code
- •Maintain a clean and safe work area
- •Walk the homeowner through the completed project
Materials & Equipment
Tile & Surfaces
- •Shower wall tile
- •Shower floor tile (mosaic or other)
- •Bathroom floor tile
- •Grout, thinset, and waterproof membrane
Fixtures & Hardware
- •Vanity cabinet and countertop
- •Sink, faucet, and drain
- •Toilet
- •Showerhead, valve trim, and shower glass
Electrical & Accessories
- •Light fixtures and exhaust fan
- •Mirror and medicine cabinet
- •Towel bars, hooks, and accessories
- •GFCI outlets and switch plates
Quality Control Standards
Waterproofing Integrity
Shower waterproof membrane fully sealed with no gaps at corners, niches, or penetrations. Flood test passed before tile.
Tile Work
Tile properly set with consistent grout lines, flat surfaces, no lippage, and clean cuts at edges and penetrations.
Plumbing Function
All fixtures installed, leak-free, and operating properly. Hot and cold on correct sides. Proper drainage.
Safety Protocols
Dust Containment
Seal off the bathroom from living areas during demo. Use plastic barriers and negative air when needed.
Slip Prevention
Use slip-resistant tile on shower floors and bathroom floors. Meet ADA or local code requirements.
Utility Shut-Off
Turn off water and electrical before demolition or disconnecting any fixtures.
Project Documentation
- Signed contract and scope of work
- Bathroom design and layout
- Selection schedule (tile, vanity, fixtures, hardware)
- Permit and inspection records
- Change order log
- Warranty information for all products
Financial Terms
Payment Structure
Bathroom remodels use milestone payments tied to project phases.
Terms & Conditions
- •Deposit due at contract signing (typically 10-20%)
- •Payment at demo completion and rough-in
- •Payment at tile completion
- •Payment at fixture installation
- •Final payment after punch list completion
- •Change orders require written approval before work proceeds
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All plumbing and electrical passes inspection
- 2Waterproofing tested and passed before tile
- 3Tile installed per spec with clean grout lines
- 4Vanity, toilet, and all fixtures installed and leak-free
- 5Shower glass installed and sealed
- 6Punch list completed and signed off
Frequently Asked Questions
Ready to Use This Bathroom Remodel Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Plumbing
Plumbing Scope of Work Template
View Template →Tile
Tile Scope of Work Template
View Template →Electrical
Electrical Scope of Work Template
View Template →Flooring
Flooring Scope of Work Template
View Template →Painting
Painting Scope of Work Template
View Template →Waterproofing
Waterproofing Scope of Work Template
View Template →