Rough Framing Scope of Work Template

Download a free rough framing scope of work template. Covers wall, floor, and roof framing, sheathing, and structural hardware for rough framing projects.

Download Free Template

Rough Framing Scope of Work Template
Download:

What's Included

Rough framing is the structural phase — floors, walls, roof, and sheathing. It's everything that happens before insulation, drywall, and finishes go in. Having a clear scope of work means everyone knows what's being framed and how. This template focuses specifically on rough framing work. It's ideal for separating rough framing scope from finish carpentry when they're bid separately. Adjust it for your project plans and hand it over.

Project Overview

This scope covers rough framing including structural wall, floor, and roof framing, sheathing, and hardware. It does not include finish carpentry, trim, or cabinet installation.

Typical Projects Include:

  • New construction rough framing
  • Addition or bump-out framing
  • Second-story addition
  • Garage or shop building
  • Interior wall rough framing for remodels
  • Roof reframing

Scope of Work

Layout & Prep

TaskDescription
Foundation LayoutSnap chalk lines and verify foundation dimensions match building plans.
Sill Plate InstallationDrill and install sill plates with anchor bolts and sill seal gasket.
Material OrganizationSort and stage lumber deliveries. Identify and set aside engineered members.

Structural Framing

TaskDescription
Floor FramingInstall beams, floor joists, rim board, blocking, and subfloor decking.
Wall FramingBuild and raise exterior and interior walls. Install headers, cripples, and corner assemblies.
Roof StructureSet trusses or build conventional rafters with ridge board. Install ceiling joists and collar ties.
SheathingInstall roof and wall sheathing per nailing schedule. Include roof underlayment if in scope.

Hardware & Inspection

TaskDescription
Structural HardwareInstall all engineered connectors — joist hangers, hold-downs, straps, and hurricane clips.
BlockingInstall fire blocking, draft stopping, and backing as required by code and plans.
Inspection PrepReview work against plans, clean up, and schedule framing inspection.

Timeline & Milestones

Rough framing timeline for a typical residential project.

PhaseDurationDescription
Layout & Sill1 dayLayout verification and sill plate installation.
Framing1-3 weeksFloor, wall, and roof framing.
Sheathing & Hardware2-4 daysSheathing, hardware, blocking, and inspection.

Roles & Responsibilities

Client / General Contractor

  • Provide approved plans and engineering
  • Supply or coordinate materials
  • Ensure foundation is complete and level
  • Schedule crane for truss setting
  • Process payments per agreement

Framing Crew

  • Frame per approved plans
  • Install all structural hardware
  • Install blocking per code and specs
  • Maintain a clean and safe work site
  • Pass framing inspection

Materials & Equipment

Lumber

  • Dimension lumber (2x4, 2x6, 2x8, etc.)
  • Engineered beams (LVL, PSL)
  • Engineered joists (TJI)
  • Plates and blocking

Sheathing & Deck

  • OSB or plywood sheathing
  • T&G subfloor
  • Roof underlayment (if included)

Hardware & Fasteners

  • Structural connectors per engineering
  • Framing nails (16d and 10d)
  • Sheathing nails per code schedule
  • Anchor bolts and sill seal

Quality Control Standards

Plan Accuracy

All wall locations, openings, and structural members match approved plans.

Structural Integrity

All connections made per engineering. No missed hangers, straps, or hold-downs.

Nailing

Sheathing and framing nailed per building code nailing schedule.

Safety Protocols

Fall Protection

Guardrails or harnesses for all work above 6 feet.

Truss Handling

Never walk on unbraced trusses. Brace per truss manufacturer's guidelines.

Power Tool Safety

Use proper guards and safety features on all saws and nailers.

Project Documentation

  • Signed scope of work
  • Approved building plans
  • Engineering schedules (truss, beam, hardware)
  • Framing inspection record
  • As-built photos
  • Material delivery receipts

Financial Terms

Payment Structure

Payments based on rough framing milestones.

Terms & Conditions

  • Deposit at mobilization (typically 20-30%)
  • Progress payment at wall completion
  • Progress payment at dry-in (roof sheathed)
  • Final payment after framing inspection
  • Change orders in writing before extra work

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1Structure framed per approved plans
  • 2All sheathing installed with correct nailing
  • 3Hardware installed per engineering
  • 4Blocking complete
  • 5Framing inspection passed
  • 6Site cleaned up