Project Overview
This scope covers cabinet supply and installation including selection, ordering, delivery, installation, hardware, and trim work.
Typical Projects Include:
- Kitchen cabinet replacement
- New construction kitchen cabinets
- Bathroom vanity cabinets
- Pantry or utility cabinets
- Garage or workshop cabinets
- Cabinet door and hardware replacement
Scope of Work
Selection & Ordering
| Task | Description |
|---|---|
| Measurements | Measure the space accurately. Document window, door, outlet, and plumbing locations. |
| Cabinet Selection | Select cabinet line, door style, color/finish, and interior options with the client. |
| Layout Drawing | Create a cabinet layout showing every cabinet, its size, and position. |
| Order Placement | Place the order with the supplier. Confirm lead time and delivery date. |
Installation
| Task | Description |
|---|---|
| Delivery & Inspection | Receive delivery and inspect all cabinets against the order. Report damage immediately. |
| Upper Cabinet Install | Install wall cabinets first. Secure to studs, level and plumb, shim as needed. |
| Base Cabinet Install | Install base cabinets. Level front-to-back and side-to-side across the entire run. |
| Fillers & Panels | Install filler strips between cabinets and walls. Install end panels and decorative pieces. |
Finishing Touches
| Task | Description |
|---|---|
| Doors & Drawers | Install and adjust all doors and drawers for consistent alignment and smooth operation. |
| Hardware | Install knobs, pulls, and any soft-close mechanisms. |
| Crown & Trim | Install crown molding, light rail, and toe kick boards. |
| Walkthrough | Walk the finished project with the client and make any final adjustments. |
Timeline & Milestones
Cabinet lead time is typically 2-8 weeks depending on the brand. Installation takes 2-5 days.
| Phase | Duration | Description |
|---|---|---|
| Selection & Order | 1-2 weeks | Measurements, selections, and ordering. |
| Lead Time | 2-8 weeks | Cabinet manufacturing and delivery. |
| Installation | 2-5 days | Installation, hardware, and trim. |
Roles & Responsibilities
Property Owner
- •Make selections and approve layout
- •Ensure space is ready for installation
- •Be available for delivery coordination
- •Process payments per the agreed schedule
Cabinet Contractor
- •Take accurate measurements
- •Create layout and place order
- •Receive and inspect cabinets
- •Install cabinets, hardware, and trim
- •Walk the project and make final adjustments
Materials & Equipment
Cabinets
- •Upper (wall) cabinets
- •Base cabinets
- •Tall/pantry cabinets
- •Specialty units (corners, lazy susans)
Accessories
- •Door and drawer hardware
- •Interior organizers and pull-outs
- •Crown molding and trim
- •End panels and fillers
Installation Hardware
- •Cabinet screws
- •Shims
- •Clamps
- •Level
Quality Control Standards
Level & Plumb
All cabinets level and plumb. Upper cabinets aligned. Base cabinets level across the run.
Smooth Operation
All doors and drawers open and close smoothly with no sticking or misalignment.
Consistent Gaps
Even spacing between doors and drawers throughout the installation.
Safety Protocols
Heavy Lifting
Use a cabinet jack or helper for wall cabinets. Don't try to solo-hang uppers.
Electrical Safety
Turn off power before drilling near outlets. Know where wiring runs behind the walls.
Clean Workspace
Keep the work area clean and organized to prevent trips and falls.
Project Documentation
- Signed contract and scope of work
- Cabinet layout drawing
- Order confirmation with quantities and sizes
- Delivery receipt and damage report
- Hardware selections
- Warranty documentation
Financial Terms
Payment Structure
Cabinet projects typically split between material cost and installation labor.
Terms & Conditions
- •Design/measurement deposit at signing
- •Cabinet material deposit at order (typically 50%)
- •Material balance due before delivery
- •Installation payment due after completion
- •Changes after order may incur restocking fees
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1All cabinets installed per the approved layout
- 2Level, plumb, and securely mounted to studs
- 3Doors and drawers aligned and operating smoothly
- 4Hardware installed consistently
- 5Crown and trim completed
- 6No damage to finished cabinets
Frequently Asked Questions
Ready to Use This Cabinets Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Cabinet Installation
Cabinet Installation Scope of Work Template
View Template →Cabinetry
Cabinetry Scope of Work Template
View Template →Countertops
Countertops Scope of Work Template
View Template →Kitchen Remodel
Kitchen Remodel Scope of Work Template
View Template →Finish Carpentry
Finish Carpentry Scope of Work Template
View Template →Painting
Painting Scope of Work Template
View Template →