Siding Installation Scope of Work Template

Download a free siding installation scope of work template. Covers tear-off, house wrap, siding, trim, and finishing for siding contractors.

Download Free Template

Siding Installation Scope of Work Template
Download:

What's Included

Siding is the face of the house — it needs to look good and keep water out. A scope of work defines the siding type, what's being replaced, how trim and details are handled, and the quality expectations. This template covers removal, house wrap, siding installation, and trim. It works for vinyl, fiber cement, wood, and engineered wood siding. Customize it for your project.

Project Overview

This scope covers siding installation including old siding removal, house wrap, siding installation, and trim. Applicable to residential and commercial exterior cladding projects.

Typical Projects Include:

  • Whole-house siding replacement
  • Vinyl siding installation
  • Fiber cement (HardiePlank) installation
  • Wood or cedar siding
  • Partial siding repair
  • New construction siding

Scope of Work

Removal & Prep

TaskDescription
Old Siding RemovalRemove existing siding, trim, and accessories. Dispose of debris.
Sheathing InspectionInspect wall sheathing for damage, rot, or soft spots. Replace as needed.
House WrapInstall or repair house wrap (weather-resistive barrier). Tape all seams and integrate with window and door flashing.
Furring & PrepInstall furring strips or rain screen if specified. Prep the surface for siding attachment.

Siding Installation

TaskDescription
Starter StripInstall starter strip level along the bottom of the wall.
Siding PanelsInstall siding panels from bottom to top. Maintain proper overlap, nailing, and expansion gaps.
Corners & TrimInstall inside corners, outside corners, J-channel, and window/door trim.
Soffits & FasciaInstall soffit panels and fascia boards (if in scope). Ensure proper ventilation at soffits.

Details & Cleanup

TaskDescription
CaulkingCaulk around windows, doors, and penetrations with compatible, paintable sealant.
Touch-UpTouch up any paint or finish on cut ends (fiber cement). Install final trim pieces.
CleanupRemove all debris, old siding, and nails from the property. Leave the site clean.
WalkthroughWalk the completed siding with the homeowner. Check alignment, trim, and overall appearance.

Timeline & Milestones

Most residential siding projects take 1-3 weeks depending on house size and siding type.

PhaseDurationDescription
Removal & Prep2-4 daysOld siding removal, sheathing repair, and house wrap.
Siding Installation3-8 daysSiding, trim, corners, and soffits.
Details & Cleanup1-2 daysCaulking, touch-up, and cleanup.

Roles & Responsibilities

Property Owner

  • Select siding type, color, and trim style
  • Move items away from the exterior walls
  • Provide access to all sides of the house
  • Process payments per the agreed schedule

Siding Contractor

  • Remove old siding and repair sheathing
  • Install house wrap and siding per manufacturer specs
  • Install all trim, corners, and accessories
  • Caulk and seal all penetrations
  • Clean up and walk the project

Materials & Equipment

Siding

  • Siding panels (vinyl, fiber cement, wood)
  • Starter strip
  • J-channel and utility trim
  • Inside and outside corners

Prep

  • House wrap
  • House wrap tape
  • Flashing (window, door, kick-out)
  • Sheathing (for repairs)

Equipment

  • Circular saw or siding cutter
  • Nail gun (for fiber cement/wood)
  • Scaffolding or ladders
  • Caulking guns

Quality Control Standards

Level & Straight

Siding courses are level and straight across each wall. No waves or bowing.

Proper Nailing

Nails centered in slots (vinyl) or per manufacturer nailing pattern. Not too tight — siding must expand.

Weather Barrier

House wrap is continuous with taped seams and proper integration with window and door flashing.

Safety Protocols

Fall Protection

Use scaffolding or ladders safely. Fall protection for work above 6 feet.

Cutting Safety

Wear eye and hearing protection when cutting siding. Use dust control for fiber cement.

Lead Paint

Test for lead paint on homes built before 1978 before removing old siding. Follow EPA RRP Rule.

Project Documentation

  • Signed contract and scope of work
  • Siding product and color selection
  • House wrap installation photos
  • Building permit (if required)
  • Manufacturer warranty information
  • Before and after photos

Financial Terms

Payment Structure

Siding projects are typically billed with milestone payments.

Terms & Conditions

  • Deposit due at contract signing (typically 30-40%)
  • Progress payment after removal and house wrap
  • Final payment after siding installation and cleanup
  • Sheathing repair is a change order
  • Material cost fluctuation clauses may apply

Acceptance Criteria & Sign-Off

The project is considered complete when the following criteria are met:

  • 1Siding installed level and straight on all walls
  • 2Trim and corners installed cleanly
  • 3House wrap intact with taped seams
  • 4All penetrations caulked and sealed
  • 5Soffits and fascia installed (if in scope)
  • 6Property cleaned of all debris

Frequently Asked Questions

Ready to Use This Siding Installation Template?

Fill in your project details and download a professional, customized scope of work PDF in seconds.