Project Overview
This scope covers roofing contractor services including roof assessment, material procurement, installation, quality assurance, and warranty. Applicable to residential and commercial roofing projects.
Typical Projects Include:
- Full roof replacement
- Roof repair and patching
- Storm damage restoration
- New construction roofing
- Flat-to-pitched roof conversion
- Multi-family or HOA roofing project
Scope of Work
Assessment & Planning
| Task | Description |
|---|---|
| Roof Inspection | Inspect the existing roof for damage, wear, and ventilation issues. Provide findings and recommendations. |
| Measurements | Measure the roof and calculate material quantities. Account for waste and complexity. |
| Material Specification | Specify roofing products — shingle line, color, underlayment, and accessories. |
| Permits | Pull required building permits and schedule inspections. |
Execution
| Task | Description |
|---|---|
| Property Protection | Set up tarps, boards, and protection for landscaping, siding, and the driveway. |
| Tear-Off & Prep | Remove old roofing, inspect and repair the deck, and prep for new installation. |
| Installation | Install underlayment, shingles, flashing, and ventilation per manufacturer and code requirements. |
| Quality Check | Inspect completed work on the roof and from the ground before cleanup. |
Closeout
| Task | Description |
|---|---|
| Cleanup | Remove all debris, run magnetic nail sweep, clean gutters, and restore the property. |
| Final Walk | Walk the property with the homeowner. Point out completed work and address any concerns. |
| Warranty Registration | Register the manufacturer warranty. Provide the homeowner with warranty documentation. |
| Inspection | Meet the building inspector for final roof inspection. Address any corrections. |
Timeline & Milestones
Most residential re-roofs are completed in 1-3 days, weather permitting.
| Phase | Duration | Description |
|---|---|---|
| Assessment | 1-2 days | Inspection, measurements, and planning. |
| Execution | 1-3 days | Tear-off, installation, and quality check. |
| Closeout | 0.5-1 day | Cleanup, walkthrough, and warranty. |
Roles & Responsibilities
Homeowner
- •Select shingle type and color
- •Provide access to the property
- •Move vehicles and patio furniture
- •Process payments per the agreed schedule
Roofing Contractor
- •Assess the roof and recommend solutions
- •Pull permits and manage inspections
- •Provide all materials and labor
- •Install per manufacturer specifications
- •Clean up and provide warranty documentation
Materials & Equipment
Roofing Materials
- •Shingles (specified brand and line)
- •Synthetic underlayment
- •Ice and water shield
- •Ridge cap and starter strip
Accessories
- •Drip edge (eave and rake)
- •Flashing (step, valley, pipe boots)
- •Ridge vent
- •Roofing nails and sealant
Equipment
- •Roofing nailer and compressor
- •Dumpster or dump trailer
- •Ladders and scaffolding
- •Magnetic nail sweeper
Quality Control Standards
Nailing Pattern
Correct number of nails per shingle in the manufacturer's nailing zone. No high nails.
Straight Lines
Shingle courses are straight with consistent exposure. Visible from ground level.
Weathertight
All penetrations, valleys, and wall intersections are properly flashed and sealed.
Safety Protocols
Fall Protection
Harnesses, anchors, and ropes used on all steep-slope roofs per OSHA requirements.
Tool Safety
Pneumatic nailers and power tools used safely with proper training.
Weather
No roofing in rain, lightning, or high winds. Tarps available to cover open areas if weather threatens.
Project Documentation
- Signed contract and scope of work
- Roof inspection report
- Material specifications and color
- Building permit
- Final inspection record
- Manufacturer warranty certificate
Financial Terms
Payment Structure
Standard roofing payment terms with deposit and completion payment.
Terms & Conditions
- •Deposit due at contract signing (typically 30-50%)
- •Final payment due upon completion and cleanup
- •Deck repair billed per sheet as a change order
- •Insurance supplements processed per claim requirements
- •Payment due within 30 days
Acceptance Criteria & Sign-Off
The project is considered complete when the following criteria are met:
- 1Roof installed per manufacturer specifications and building code
- 2All flashing and details properly installed
- 3Property cleaned and nail sweep completed
- 4Building inspection passed
- 5Manufacturer warranty registered
- 6Homeowner walkthrough completed
Frequently Asked Questions
Ready to Use This Roofing Contractor Template?
Fill in your project details and download a professional, customized scope of work PDF in seconds.
Related Templates
Roofing
Roofing Scope of Work Template
View Template →Commercial Roofing
Commercial Roofing Scope of Work Template
View Template →Siding Installation
Siding Installation Scope of Work Template
View Template →Flashing
Flashing Scope of Work Template
View Template →Waterproofing
Waterproofing Scope of Work Template
View Template →General Contractor
General Contractor Scope of Work Template
View Template →